Changes and Construction in the Student Center
Changes and Construction in the Student Center
Today I saw that the Student Center has construction. From the main entrance, you must walk left past the stairs and go in the back entrance to the cafeteria. In the basement, the Rathskellar is now the Pride Den. Do they have food there? What happens there? When I was in camp, campers ate their so they wouldn't mix with students at ground level. The Post Office that used to be a separate unit was put in the Bookstore.
- HofstraHockey
- Posts: 790
- Joined: Wed Jul 16, 2014 11:14 pm
- Contact:
Re: Changes and Construction in the Student Center
They're taking out the bank and putting in a new pizza place.
Re: Changes and Construction in the Student Center
The bank was built while I was a student from 2003 to 2007.